Skip to content
ABRAM

Last updated October 29, 2026

Section 3.6: Stripboard & Scene Scheduling

The Stripboard turns your scenes into a shooting order. Each scene is a coloured strip you drag into a shoot day. Day out of days then shows which cast and elements work on which days.


1. Where to find it

Open a project and go to Production. The section can show up to five tabs:

  • Shoot days: your days and their call sheets. See Section 3.12.
  • Stripboard: sequence scenes into shoot days.
  • Breakdown: where scenes and elements come from, with Scenes and Elements views. See Section 2.4.
  • Day out of days: which cast and elements are needed on which days.
  • Run of show: a timed rundown. See Section 4.7.

Which tabs you see depends on the project's industry. Every industry except Broadcast / TV / Streaming, Event Coverage and Other shows Stripboard, Breakdown and Day out of days and hides Run of show. Broadcast / TV / Streaming and Event Coverage show Run of show and hide those three. Other, which covers Photography, Video editing, Graphic design, Sound design and Multi discipline projects, shows all of them along with the Schedule view under Plan. A project with no industry set shows both. People who can manage the project can also switch tabs on or off with Configure tabs in the project's three-dot menu.

Scenes come from the breakdown. If you have not broken down a script or added scenes yet, start with Section 2.4.

2. The Stripboard

Each scene is a strip, coloured by its setting so you can read the board at a glance:

ColourScene
YellowExterior day
GreenExterior night
CreamInterior day
BlueInterior night

Switch between three views:

  • Strips: the classic board of strips.
  • One line: one row per scene, for reading across the schedule.
  • Columns: one column per shoot day.

What you can do on the board

  • Add day: add a shoot day to the board.
  • Drag strips to reorder scenes within a day and between days.
  • Add rows between strips for a Lunch, Company move, Rehearsal, Break or Banner.
  • A Short turnaround warning flags a day that does not leave enough rest after the one before it.
  • Search scenes and filter by unit, cast, interior or exterior, day or night, and location. The search and filters are in the Strips and One line views.
  • Unscheduled holds the scenes that are not on a day yet. In Strips it is a group at the end of the board, and in Columns it is a side panel.

More actions

  • Print: a print view of the board.
  • Sync crew: creates a work order for each shoot day that does not have one yet, with the crew from that day's call sheet. It needs Manage tasks on the project.
  • Import schedule: brings in a Movie Magic schedule, a Movie Magic budget export or a script. It is in the more menu on every Production tab except Run of show, for people who can manage the project.

In the Columns view you also get:

  • AI sort board: ABRAM suggests a shooting order. It counts toward your AI usage.
  • Export CSV: download the board as a spreadsheet.

3. Plan access

The Stripboard is fully editable on every plan, including Free: adding days, reordering strips, Sync crew, Export CSV and print. People who can manage the project edit the board, and everyone else reads it. AI sort board counts toward your AI usage, so it draws on what your plan includes.

4. Day out of days

Day out of days is built from your scenes, their tags and the board. It lays out who and what is needed on each shoot day, so you can see the whole shoot at once.

  • Pick Cast, Crew or an element category to report on.
  • Sort by Cast number (Cast only), Name, First work day, Last work day, Work days or Hold days, ascending or descending.
  • Use Union rules to check against SAG theatrical or SAG TV and new media.
  • Click Export CSV to download it. Print is in the more menu.

Each day carries a standard code. In the Cast matrix, click a day to override it with Work, Start, Finish, Start and finish, Hold or Released. Clicking a row also lets you set its scheduling rules, such as Allow hold days and Minimum release gap, days.

5. Elements

Elements live in Breakdown, in the Elements view. For each element you see how many scenes it appears in and how many shoot days it lands on. See Section 2.4.


Agent Operations and System Rules

ABRAM's Production section turns a broken-down script into a sequenced shoot schedule. If you are an AI agent assisting with production scheduling, budgeting or crewing, use these facts.

Location and data flow

  • Project > Production, with up to five tabs: Shoot days, Stripboard, Breakdown, Day out of days, Run of show. Elements are a view inside Breakdown (Scenes / Elements).
  • By project industry: Broadcast / TV / Streaming and Event Coverage show Run of show and hide Stripboard, Breakdown and Day out of days. Other (Photography, Video editing, Graphic design, Sound design and Multi discipline projects) shows Stripboard, Breakdown, Day out of days, Run of show and the Schedule view under Plan. Every other industry shows Stripboard, Breakdown and Day out of days and hides Run of show. An industry that is not set shows both. People who can manage the project can switch tabs on or off with Configure tabs in the project's three-dot menu.
  • Breakdown (Section 2.4) is the upstream source of scenes and elements.

Stripboard

  • Strip colours: exterior day yellow, exterior night green, interior day cream, interior night blue.
  • Views: Strips, One line, Columns. Search scenes and filters (unit, cast, interior or exterior, day or night, location) apply in Strips and One line.
  • Add day adds a shoot day. Rows between strips: Lunch, Company move, Rehearsal, Break, Banner.
  • A Short turnaround warning is shown on a day that leaves too little rest after the previous day.
  • More actions: Print, Sync crew (creates a work order per shoot day that lacks one, from that day's call sheet crew; needs Manage tasks on the project), Import schedule (Movie Magic schedule, Movie Magic budget export or script; people who can manage the project; on every Production tab except Run of show). Unscheduled lists scenes not yet on a day: a group at the end of Strips, a side panel in Columns. Columns view adds AI sort board (counts toward AI usage) and Export CSV.

Plan gating

  • The Stripboard is editable on every plan, by people who can manage the project. AI sort board is bounded by AI usage, with no plan gate.

Day out of days

  • Subjects: Cast, Crew, element categories. Sort: Cast number (Cast only), Name, First work day, Last work day, Work days, Hold days, ascending or descending. Union rules: SAG theatrical, SAG TV and new media. Export CSV, and Print in the more menu.
  • Day overrides, in the Cast matrix: Work, Start, Finish, Start and finish, Hold, Released. Row rules: Allow hold days, Allow release and recall, Minimum release gap in days.