Days 1 and 2: Angeles Crest · Sep 23 – Sep 24 Pack list · 6 of 8 back
Ember 833 Mixer1Sep 23 – Sep 24Returned$175/day
Inverter Generator 70001Sep 23 – Oct 7In use$180/day
Sensa 600D Pro4Sep 23 – Oct 7In use$95/day
Three of six packed,and you know who.
Every work order gets one pack list, ticked Packed on the way out and Returned on the way back.
Day 3: Pickups on Stage 4
Details
WhenOct 7
Progress2 of 6 packed
PackingReturning
Camera1 / 3
Matte Box and Rod Kit
Elena Alvarez · Oct 6, 3:00 PM
Packed
Onyx S70 Body
To pack
Vesper K6
To pack
Day 3: Pickups on Stage 4
Details
WhenOct 7
Progress2 of 6 packed
PackingReturning
Camera1 / 3
Matte Box and Rod Kit
Elena Alvarez · Oct 6, 3:00 PM
Packed
Onyx S70 Body
To pack
Vesper K6
To pack
Day 3: Pickups on Stage 4
Details
WhenOct 7
Progress2 of 6 packed
PackingReturning
Camera1 / 3
Matte Box and Rod Kit
Elena Alvarez · Oct 6, 3:00 PM
Packed
Onyx S70 Body
To pack
Vesper K6
To pack
MonthWeekOctober 2026TodayConflicts 90
Mon
Tue
Wed
Thu
Fri
Sat
Sun
28
C-Stand 40in with Arm (Set C)
Ember Lav Wireless II (Set B)
+97 more
29
Aura G6 Body (Set B)
Aura Tube Bank 21 (Set B)
+90 more
30
Box Truck 16ft (Set E)
Ember F6 Field Recorder (Reserve)
+57 more
11832h
2602
Articulating Arm with Clamp (Set B)
Foam Core 4x8 (pair)
+58 more
21248h
143
Aura 4-Head Spot Kit (Set C)
Black Wrap Roll (Set C)
+41 more
31488h
153
3-Stud Battery 98Wh (Set C)
Articulating Arm with Clamp (Set D)
+51 more
41144h
145
C-Stand 40in with Arm (Set B)
First Aid Kit: Set (Set C)
+43 more
51040h
141
Body Support Rig (Set C)
High-Roof Van: Grip (Set E)
+39 more
61480h
154
Body Support Rig
Cargo Van: Unit 1 (Set E)
+52 more
72232h
179
Aura G6 Body
C-Stand 40in with Arm
+77 more
82504h
1843
Apex RS3 Pro Gimbal (Reserve)
Aura G6 Body (Reserve)
+85 more
92904h
1924
Apex RS3 Pro Gimbal (Set B)
Aura Pixel Tube (4-pack) (Set B)
+94 more
103064h
2935
Aura Panel 6X
Aura Pixel Tube (4-pack) (Set C)
+95 more
113320h
11025
Aura 4-Head Spot Kit
Aura Panel 6X (Set B)
+105 more
122848h
2981
Apex RS3 Pro Gimbal
Apex RS3 Pro Gimbal
+98 more
132360h
1831
Body Support Rig (Set B)
CTB Roll 1/2 (Set C)
+83 more
142216h
2751
Apex RS3 Pro Gimbal (Set C)
Archive restoration: 1974 16mm
+75 more
151816h
2631
Cable Ramp (4ft) (Set C)
Cargo Van: Unit 2 (Set E)
+63 more
161152h
1431
↳Apex RS3 Pro Gimbal
↳Apex RS3 Pro Gimbal
+43 more
17776h
1291
↳Apex RS3 Pro Gimbal
↳Apex RS3 Pro Gimbal
+29 more
18472h
151
↳Apex RS3 Pro Gimbal
↳Apex RS3 Pro Gimbal
+15 more
Frequently asked questions
Equipment by department, covering camera, lighting, grip, audio, props, set dec and wardrobe, alongside vehicles, stages and locations. Every row carries quantity, condition, location, serial number and a day rate.
Gear on a project starts as Needed, and Book checks the quantity you own for those dates before anything is held. When stock runs short, Request anyway holds it as requested, which never blocks another booking.
Yes. A kit bundles a package into one bookable thing, and booking the kit books every item inside it.
Every item carries a day rate, and booking one copies that rate onto the booking itself. The project resource list shows the rate, the quantity and the window on every line, and exports as CSV.
Each work order has one pack list, opened from the project's Equipment tab. Lines go from To pack to Packed on the way out and to Returned on the way back, and the Packing tab lists every job.
Inventory with quantities and day rates, reusable kits, and the bookings against them. ABRAM adds the production around that inventory: the shooting schedule, the crew who work it, the client portal and the invoices.
Workfront is a trademark of Adobe Inc. Rentman is a trademark of its respective owner. ABRAM is not affiliated with or endorsed by any of them.
Equipment Inventory, Kits and Booking for Production Studios
ABRAM is the Creative Intelligence platform. It's where filmmakers, agencies and creators plan and run their productions. ABRAM resource management keeps equipment, kits, vehicles, stages and locations in one inventory and books them against production dates, with each item's day rate carried into the project budget. It is for production companies and studios that book gear and rooms for their shoots.
ABRAM keeps equipment, kits, vehicles, stages and locations in one inventory, books them against production dates with quantity-aware availability checks, shows those bookings on a resource calendar, and carries each item day rate onto the booking and into project cost. Gear added to a project starts as Needed; Book places it on a work order after checking the quantity owned for those dates, and Request anyway holds it as requested when stock is short. Each work order has one pack list whose lines move from To pack to Packed to Returned, and the Packing tab indexes them. The Analytics tab charts utilization: units booked against units available per day, with booked hours, utilization, estimated cost and items out now. Resources are on Pro and above. Items tracked on Pro: 80. Items tracked on Studio: uncapped.
[ABRAM] [providesCategory] [Equipment and Resource Management]
[ABRAM] [checksAvailabilityAgainst] [Owned Quantity Per Date Window]