Skip to content
ABRAM

Last updated October 29, 2026

Section 3.1: Master Project Detail Page Overview

Every project opens on one page. The header tells you where the project stands, and eight sections hold everything else: the plan, the shoot, the crew, the money, the files and the client.

This article is a map. Each part points to the guide that covers it in full.


1. The project header

The bar at the top shows a back arrow to your projects, the project title, the sections, and the project's status. Under it, a strip of facts stays in view on every tab:

  • Client: the portal client linked to the project, when there is one.
  • Project #: the project's number. Click it to copy it.
  • Budget, for people who can see the project's money, and Due.
  • Owner: who runs the project. People who manage the project can type a name in this field to change it.
  • Team: how many people are on the project.
  • Progress: how far through the work the project is, as a percentage.

The Status control in the bar reads Planning, In progress, On hold, Completed or Cancelled. People who can manage the project can change it there.

Commercial video campaign

ClientNorthgateProject#1042Budget$25,000DueJul 30, 2026OwnerAmelia LewisTeam4 membersProgress68%
Description

Summer launch campaign for Northgate. Two shoot days, a drone unit, and an edit to deliver by the end of July.

ABRAM update

Both shoot days are wrapped. Drone permits are in. The rough cut is due to the editor on Jul 10.

Tags
CommercialVideo
Next milestone
Shoot wrapped

Timeline

Jun 15
Jun 22
Jun 29
Jul 6
Jul 13
Jul 20
Pre-production
Production
Post-production
Budget spent

$17,500

of $25,000
Team capacity
Amelia32 / 40 h
Marcus40 / 40 h
Sarah0 / 40 h
Upcoming
Shoot wrapped, Jun 28
Rough cut, Jul 10
Activity
Amelia L. uploaded the creative brief
Marcus C. started Drone and B-roll capture

More project actions

Beside the status, the refresh icon reloads the page, the gear opens Project settings, and the three-dot menu (More project actions) holds:


2. The eight sections

The project is split into sections, each with one or more tabs.

SectionTabsWhat it is for
OverviewThe project at a glance.
PlanTasks, Timeline, ScheduleWork packages, milestones, deliverables and work orders, and the dates they run on. See Section 3.2 and Section 3.4.
ProductionShoot days, Stripboard, Breakdown, Day out of days, Run of showThe shoot: days and call sheets, scene scheduling, the script breakdown and live rundowns. See Section 3.12.
ResourcesTeam, Time, EquipmentThe crew, hours logged against the project, and gear. See Section 4.3, Section 5.5 and Section 3.10.
BudgetingBudget, ExpensesThe project's budget and its expenses. See Section 3.11.
FilesDocumentsProject files. See Section 6.3.
ClientClient discussion, CallsThe conversation your client reads in their portal, and call transcripts. See Section 6.4.
ActivityThe project's team conversation, with a running log of changes to the project.

Which tabs you see

Some tabs depend on the project, your plan or your access:

  • Stripboard, Breakdown and Day out of days are hidden for projects in the broadcast and event industries. Run of show shows for broadcast, event and other projects, and for projects with no industry set.
  • Schedule shows for projects whose industry is set to other.
  • Projects for video editing, motion design, sound design and graphic design start without Shoot days, the stripboard views and Equipment. You can switch them on in Configure tabs.
  • Budgeting needs access to the project's money.
  • Time needs the Pro plan or above.
  • Client discussion needs a linked portal client and permission to manage the project.
  • Calls needs permission to manage the project and the Studio plan or above.

3. The Overview tab

Overview opens first. It holds:

  • The project's description, Project number, Tags, Links and any Custom fields your organization uses.
  • Timeline: a short Gantt of the work. People who manage the project can click AI optimize from here.
  • A strip of counts for Overdue deliverables, Overdue milestones and In review.
  • Cards for the budget (for people who can see the project's money), team capacity, what is upcoming and recent activity.

4. Project settings

Click the gear (Project settings) in the bar. Settings open in a panel on the right. The project's owner, and your organization's owners and admins, see these sections:

  • Project: title, description, budget, Overtime multiplier, status, dates, ROM estimate, Timezone and Project owner.
  • Team: the team or location the project belongs to, when your organization uses teams and locations. These are on the Studio plan and above.
  • Client portal: switch what the client sees in their portal: Timeline, Run of show, Call sheets, Scheduling / stripboard and Wrap summary.
  • Slack: Slack notifications for this project, with a channel per category. Each category starts on Inherit, which uses your organization's setting. Slack is on the Pro plan and above. See Section 6.1.
  • Project info: the project ID, and when it was created and last updated.
  • Danger zone: Archive project or Delete project.

Click Save changes when you are done.


5. Choose which tabs you see

  1. Click the three-dot menu (More project actions) and choose Configure tabs.
  2. Switch tabs on or off, grouped by section. Overview is marked Always on. A tab you cannot use shows No access or Plan.
  3. Click Save. ABRAM confirms with Tabs saved.

Reset to defaults returns the project to the tabs its type starts with. Your choice applies to the whole project, for everyone on it.


6. Deliverable and work order pages

Click a deliverable to open it in a panel beside the list, then click Open full details for its own page. Click a work order to open it, with the same Open full details link. Creating a new work order goes straight to its full page. See Section 3.13: Deliverable and Work Order Pages.